Request Title
Status
Distance
Posted
Remaining
Budget
Last Bid
#Bids
#Visits
All round Tradesman Bidded Login req. 2012-01-09 3 Days 100.00 180.00 2 81 Redec - 3 x rooms Bidded Login req. 2011-04-26 Closed 3.00 0.00 3 134 Extend Driveway and ... Bidded Login req. 2011-03-21 Closed 3,500.00 3,497.00 3 177 build garden wall Bidded Login req. 2011-03-05 Closed 250.00 2,399.00 3 154 Partition Wall Erect... Bidded Login req. 2011-02-24 Closed 150.00 200.00 1 98 concrete base for (g... Bidded Login req. 2011-01-26 Closed 300.00 300.00 7 272 Build Offices Bidded Login req. 2010-12-17 Closed 800.00 650.00 1 181 fixing conservatory ... Bidded Login req. 2010-08-26 Closed 100.00 99.00 1 113 knocking down a inte... Bidded Login req. 2010-06-05 Closed 500.00 449.00 4 149 Extension Bidded Login req. 2010-05-01 Closed 30,000.00 22,000.00 7 263 Build a utility room Bidded Login req. 2010-02-27 Closed 5,000.00 3,444.00 6 229 Construct Soakaway Bidded Login req. 2010-01-06 Closed 0.00 450.00 4 252 Block driveway repai... Bidded Login req. 2009-12-21 Closed 200.00 300.00 2 158 remove load bearing ... Bidded Login req. 2009-11-24 Closed 900.00 2,599.00 4 153 open up eaves Bidded Login req. 2009-11-02 Closed 300.00 290.00 3 110 Replace lintle and w... Bidded Login req. 2009-08-24 Closed 400.00 335.00 12 249 removal of asbestos ... Bidded Login req. 2009-08-01 Closed 3,500.00 2,197.00 12 220 Garage Bidded Login req. 2009-07-06 Closed 1,200.00 1,150.00 1 252 front garden wall Bidded Login req. 2009-06-03 Closed 750.00 799.00 3 183 Small Bathroom - Ext... Bidded Login req. 2009-04-25 Closed 500.00 280.00 6 279
Total 1 of 2 (<< next >> ) 1 2 Page